A medical clinic facade was clad in granite despite winter temperatures and a fixed construction schedule.
_Krasnodar, Russia / Natural granite_
The Challenge
The work proceeded during cold weather, at temperatures down to approximately 5°C, because − postponement was not possible.
IVAN’S APPROACH
Ivan selected a manufacturer-approved cement-based adhesive system formulated for suitable low- temperature installation conditions and organized work accordingly.
The Outcome
The facade cladding was carried out under the project’s cold-weather constraints.

Ready to restore your stone?
Schedule your free consultation today
Most projects done in 1 to 2 days. No demolition. No construction mess.

